Español (ver este sitio en español)

Our Work

Every photo on this page is a job Michael did himself, taken on site with a phone. Some are finished rooms and some are walls that are still open, because the part behind the tile is the part you are actually paying for.

12 photos from recent jobs across Boca Raton, Highland Beach & Delray Beach. No stock photography and no other company's projects.

    • Finished bathroom with a frameless glass corner shower, marble-look porcelain walls and floor, a built-in bench and a floating wood vanity.
    • Close view of the same shower showing the recessed niche, the ceiling rain head, the wall mixer and the mosaic shower floor.

    Bathroom rebuilt in large-format porcelain

    Marble-look porcelain on every wall and across the floor, with a niche and a bench built into the shower rather than added on afterwards. The pan is a fine mosaic laid to a linear drain, and the frameless glass went in last so it could be cut to the tile that was actually there.

    July 2025 · Construction & Remodeling, Flooring & Tile

    • Dated kitchen with pickled oak cabinets, laminate counters, terracotta tile floor and bare walls where the wall cabinets have been removed.Before
    • The same kitchen mid-job, with new white shaker cabinets hung and the peninsula base framed but not yet finished.During
    • The finished kitchen with white shaker cabinets, a stacked gray tile backsplash, chrome pendant lights and a veined stone peninsula.After

    Dated kitchen taken back and rebuilt

    The same kitchen across about three months. The wall cabinets were already off in the first photo, which is why the old adhesive lines are showing. The second is cabinets set with the peninsula still being framed. By the third the counters, the stacked tile backsplash and the pendants are in, and the stone runs down the end of the peninsula instead of stopping at the edge.

    December 2025 to March 2026 · Construction & Remodeling

    • A shower wall opened through the tile, exposing copper supply lines and a newly fitted brass mixing valve.
    • The same shower part-way through re-tiling in large-format marble-look porcelain, with the original small tile still on the right wall.

    Shower valve replaced, then the walls re-tiled

    The mixing valve behind this shower had to come out, and the only way to it was through the tile. New valve and fittings went in, then the enclosure was re-tiled in large-format porcelain. The second photo is mid-install, with the original small tile still up on the right-hand wall for comparison.

    July 2026 · Plumbing Services, Flooring & Tile

    • A large white two-story stucco house with a paver driveway, a work truck parked out front and extension ladders set against the facade.

    Exterior work on a two-story stucco house

    Working the front elevation of a large two-story house off ladders. Height is the part of a job like this that homeowners underestimate, and it is the reason to ask any contractor for their license and their insurance certificate before a ladder goes against the wall.

    May 2026 · Drywall & Painting

    • A domed two-story ceiling with crystal chandeliers and a brown water stain spreading across the plaster above an ornate iron balcony rail.

    Water staining on a two-story ceiling

    Staining spreading across a domed ceiling above a stairwell. The leak gets found first on a ceiling like this, because filling and painting over damp board only means doing the whole thing again in six months. Access is the other half of the job, two stories up over a staircase.

    May 2026 · Drywall & Painting

    • A kitchen mid-renovation with a soffit opened to expose framing and wiring, new recessed lights in the tray ceiling and the island stripped back with tools on top.

    Soffit opened up and the island stripped back

    The bulkhead over this island came open to get at what was running through it, new cans went into the tray ceiling, and the island was taken back to be rebuilt. The existing cabinets, counters and appliances stayed put, which is usually the cheaper way to change how a kitchen feels.

    April 2026 · Construction & Remodeling, Electrical & Tech

    • Gray shaker cabinets installed along a kitchen wall, base units standing open with a corner carousel fitted, waiting for countertops.

    Cabinets set and leveled before templating

    Wall and base cabinets hung and leveled, the corner carousel in, and the run left open for the counter template. This is the stage where a cabinet set that is out by an eighth turns into an expensive countertop problem, so it gets shimmed and checked before anyone measures.

    Construction & Remodeling

    • A bronze and copper carriage lantern mounted on an ornate cast stone facade, with scaffolding erected alongside it.

    Exterior lantern on an ornamental facade

    A heavy cast lantern hung off decorative cast stone, reached from staging. The anchors have to land in something that will hold the weight without splitting the molding, which takes a lot longer than it looks from the driveway.

    Electrical & Tech

Reviews

Our reviews are on Google, not on this page

Anyone can type a glowing quote onto their own website and sign it with a first name and an initial. Google will not let us edit a word, which is exactly why we would rather send you there. Real names, whatever rating they gave us, and the dates they left it.

Worked with Michael already?

A review takes about two minutes and it is genuinely how a one-man business gets found. If something was not right, call before you write it and it will get put right.

Leave a Review on Google (opens Google in a new tab)

Want to talk about a job like one of these?

Tell Michael what you have in mind and you will get an honest answer on what it takes, including if it is a job for somebody else.